Engineering Dept.
Summary of the Engineering Department
Projects, amounts of money spent and beneficiaries during
the fiscal year 2004/2005
|
Continent |
Countries |
Mosques |
Wells |
Others |
Beneficiaries |
Amounts
(S.R.) |
|
Asia |
10 |
291 |
595 |
3 |
246,600 |
15,752,385 |
|
Africa |
12 |
110 |
206 |
1 |
205,900 |
6,686,540 |
|
Europe |
1 |
1 |
- |
- |
800 |
26,521 |
|
Grand Total |
23 |
402 |
801 |
4 |
456,300 |
22,647,446 |
-
Estimated average
No. of prayers for each 100 meters is 150 worshipers
-
Estimated No. of
beneficiaries of a surface well is 200 persons.
-
Estimated No. of
beneficiaries of an artesian well is 600 persons.
The Engineering
Department is responsible for construction, digging of artesian and
surface wells wherever needed.
Formation:
The
Department of Engineering was established in 1987 with the
aim of providing assistance to the countries needing engineering projects such as
cultural centers, schools, dispensaries, hospitals, orphanages,
vocational training centers, community complexes and urban centers. The
members of the department
draw up plans designed to enhance performance, technically and
administratively, in accordance with the number of projects, their
volume and conformity with the type and style as well as the methods of
construction used in each and every country. Following this, after the
designing stage done according to a mechanism that ensures both
accuracy and confidentiality, the department then conducts the necessary
specialized technical studies and begins implementing the project.
Objectives:
Catering
to the needs of the poor and needy peoples world over
specially in
service projects such as cultural centers, schools,
wells, health care projects, orphanages, community and urban centers,
which are built in coordination with a competent branch office.
Providing technical advice required by various sectors of IIROSA.
Maintaining contributions donated by donors and implementing the
projects according to their wishes.
Means of achievement:
Organizing
the department and choosing efficient employees who are possessing the
required expertise.
Developing a mechanism of arranging business in the department,
determining the role of sections concerned with project implementation
and preparing texts and contracts associated with studies and follow up
quickly the
project implementation.
Drawing up administrative as well as technical and financial plans that
determine the needs of the underprivileged in different countries, and attracting
donors in coordination with domestic and external branch offices .
Developing and consolidating relations with donors and also with the
domestic offices which collect donations.
Studying the technical as well as the financial aspects of projects
referred to the department by domestic and
external
branch offices as well as IIROSA's headquarters so as to present the
competent official with the resultant technical view for action.
Hiring of reputable and technically professional contractors to
implement projects in various countries.
Cooperating and coordinating with other non-governmental organizations
(NGOs) to implement IIROSA projects.
Implementing projects automatically either through certain external
branch offices or through contractors hired by the department in
coordination with the external branch offices.
- Follow-up implementation throughly.
- Field inspection by IIROSA delegates from
headquarters and domestic branch offices.
- Technical as well as financial reports
supported by pictures showing various stages of implementation
- Taking delivery of completed projects.
- Documenting the implementation by writing
final reports supported by photographs and videocassettes or CDs.
|